Responsibilities and Achievements

1. Implement quality test plan on power supplier products such as performance test, VI nfl jerseys 2010mapping test and thermal test, etc.
2. Discuss with component engineer to choose the component, as well as work with purchaser for components preparation such as confirming the quality of mechanical components and the rough quotation, discuss the lead time, delivery date; etc.3.new york jets Work with Project manager together to ensure the effective of material preparation, documents preparation and modify the design scheme including PCB, component and schematic in order to meet the schedule of mass production.
4. Working closes to designprom dress in engineers and discuss with customers for detail technical solution such as system matching, new requirement and testing methods, etc.
5. Supporting the production line, and cooperate with process engineer to improve the process of pcheap prom dressroduct and solving the problem when the product fail to the ATE(automatic testing equipment) test; lower the PPM.6. Modify the design after QTP, and communicating with PCB layout engineer to update circuit layout, etc.
7. Create initial BOM and leather jacket t shirt documents (e.g.: spec documents, circuit drawing, etc).8. Support standard test lab (DS department) to analysis the failure product from test, ensure the product meet design rule and security standard of customer requirements. http://www.netbeans-forum.de http://www.box2d.org/forum http://www.esrbija.net http://forums.pligg.com http://techforum.it
Par taotao103 le jeudi 19 août 2010

Commentaires

Il n'y a aucun commentaire sur cet article.

Recherche sur NoxBlog

Connexion à NoxBlog.com

Nom d'utilisateur
Mot de passe
Toujours connecté
 

Inscription sur NoxBlog


Adresse du blog
.noxblog.com

Mot de passe

Confirmation

Adresse email valide

Code de sécurité anti-spam

Code anti-bot

J'accepte les conditions d'utilisation de NoxBlog.com